Workover Riser System
Home » Riser Systems »
Live well operations as completion, wireline interventions, coiled tubing interventions, well testing, and workover operations, are activities in wellconstruction where it is critical to keep the well barrier integrity intact.
The well access equipment package required to perform live operations on a subsea well is generally called “workover riser (WOR) system”.
We deliver turnkey solutions (products and services) to provide a complete live well barrier system for performing completion, workover, well testing, plug-and-abandonment (P&A) operations from Jack-Up`s on subsea fields.
WellPartner can provide single WOR componens or complete systems comprising of the following:
- WOR tubulars
- BOP Slick Joint Assy
- BOP Shear Sub Assy
- Length Adjustment Sub (LAS)
- SSTT & LV valve assemblies
- TH RT interfaces
- XO interfaces
- Control lines
- Chemical lines
- WellSafe Weak Link Systems
- Work Over Control System (WOCS) units
Get in touch with an expert
Jens Honoré
Manager Operations
+47 932 13 847
jens.honore@wellpartner.no